Serangoon MRT Station, Singapore

Features: An underground interchange station on the North East Line and the Circle Line in the Serangoon Central area.

Challenge: To test the air lock that connects the existing North East Line (NEL) Station with the Circle Line Station (CCL).

Vipac’s role: To conduct testing in the areas of air and pressure.

Benefit: Ensured that the air lock is functional for transfer of personnel from non-CD Station to CD-Station.

>> Download our Serangoon MRT Station Case Study Flyer